PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Electrical conduit at the 2nd Floor Facing East (600x800).jpg Electrical conduit at the 3rd Floor Facing East (600x800).jpg Excavation for the water tie in Facing North (800x600).jpg Grinding the main steel column at the Monumental Stairs Facing South (800x600).jpg Installed temporary lighting at the 1st floor Facing East (800x600).jpg Working on the skylight steel beam Facing South-East (800x600).jpg
Previous pageNext page Installed temporary lighting at the 1st floor Facing East (800x600)
Installed temporary lighting at the 1st floor Facing East (800x600)